Sacramento Chiller Project
The client for this project wanted to transition away from using an ammonia refrigeration system inside their existing plant. To accomplish this, a freon refrigeration system was installed without interruption to the client’s business. Once the freon system was installed, the ammonia was drained and properly disposed of and the ammonia equipment was demolished.
Client: Global Beverage Distributor
Location: Sacramento, CA
Services: Design Build, Construction Management